January 16, 2017 ALL

Admin Building Stair Railing Install

New stair hand railing will be installed at the exterior stairs at the Arcade entrance between the Administration Building and the B-Wing building. Access to both the Admin Building and B-Wing at this location will be closed for the day while the railings are being installed. Entrance to the Administration Building can be made using the entrance near Einstein’s and the main entry below the clock tower; entry to the B-Wing will be available using the entrances at O’Malley Center.

Thank you for your cooperation while this work is taking place.
Facilities Department