February 28, 2017 ALL

Safety Railing Installation – March 6-11

New Safety Railings are being installed at the stairs between the Administration Building and “B” Wing grand stair, as well as one new railing at each of the six arched openings located at the upper stairs sidewalk connection between these buildings. Sidewalk access between the buildings will be closed, as well as access from the Quad to the Library sidewalk, from Monday, March 6 through Saturday, March 11.

Please use the O’Malley Building as your alternate route and either the lower level or 2nd floors of the Ad to B wing during the access closings.

Call Rich Bretz @ 4313 with questions.