From Monday June 5 at 8:00pm through 6:00am on June 6 the contractor will be removing the red tile flooring in front of the elevators on the 2nd floor and IM gym levels in the Rec Plex. During this time these areas should be avoided. Thank you for understanding during these exciting improvements.