July 7, 2023 ALL

Shutdown: Main Boiler House affecting Hot Water, Monday 7/10

Monday, 7/10 at 8 am, there will be a natural gas shutdown of the Main Boiler House.

This will mean that there will be no domestic hot water for Boler, St. Ignatius, BWing, Bernet, Pacelli, and O’Malley. Boler, St. Ignatius, BWing, Bernet, Pacelli, and O’Malley buildings will continue to have domestic cold water during this shutdown. This shutdown is expected to last all day.

This shutdown is necessary to begin rerouting the natural gas line for the Athletic, Wellness & Event Center.

Please reach out to Jeremy Johnston at jjohnston@jcu.edu or x4313 with questions or concerns.