From Saturday, July 22, at 7:00am to Monday, July 24, at 6:00AM the Contractor will be installing the new flooring in front of the elevator door at the Residence Life Level. During this time, visitors traveling to the Corbo Fitness Area should exit at the IM Gym level and then proceed down the stairs in front of the pool. Thank you for understanding during these exciting improvements.