Starting on Tuesday, August 1, parking lot paving repairs will be taking place in both the Dolan Science Center East and West lots. The work in the East lot will be contained to the main access drive lane, starting at the guard house into the Dolan East lot. The work in the West lot involves removing and repaving of the entire drive lane and head in parking spaces along Carroll Blvd starting at the speed bump continuing down to the stop sign entering Carroll Expansion lot. There will also be paving taking place at the first three parking spaces closest to the campus map sign near the main entrance, with several smaller areas ground and patched through out the lot in drive lanes.
If at all possible please park in the Carroll Expansion Lot or Dolan East lot closer to the Library to avoid conflict with this work. Cones will be put in place over the weekend to help identify the areas where the paving work will be taking place. Traffic will be maintained during the work but some minor interruptions to traffic flow can be expected.
Your cooperation is appreciated.
Facilities Department