Floor leveling will be completed the evening of Monday, June 19th for the areas outside of construction walls in front of the atrium elevator doors. During this time the elevator in the atrium area will not be available. Work will start on the 2nd level of the Rec Plex around 3:00 pm and then proceed to the IM Gym level and Res Life level after 4:00 when the camps utilizing the gyms have ended. The floor leveling will dry overnight and be ready for pedestrian traffic the following morning. The Rec Plex side of the building would be accessible through the Belvoir doors. The dining hall and campus ministry areas will be available from the Schott Entry.