July 26, 2017 ALL

Parking Lot Sewer Repairs

There will be a contractor on site starting Friday, July 28, through Thursday, August 3, making repairs to catch basin sewers in both the Dolan East lot and Carroll Expansion lot. To avoid conflict with this work, please take a left when entering campus off of John Carroll Boulevard Main Gate entrance, using Admin Drive to gain access to the Boler School, Main Drive, and Belvoir lots.

Access will remain open but traffic will need to navigate through the parked car lanes vs. being able to use the main access through these lost that parallels Carroll Boulevard. Please use caution and travel at or below the 15 MPH speed limits while this work is taking place.

Thank you
Facilities Department