June 2, 2023 FAC/STAFF

Rec Plex Flooring Demolition Shutdown At Res Life

On Saturday, June 3, from 7:00am to 3:30pm the Contractor will enclose the area in front of Res Life including the area in front of the elevator door for flooring demolition. During this time visitors traveling to the Corbo Fitness Center should exit at the IM Gym level and then proceed down the stairs in front of the pool. Thank you for understanding during these exciting improvements.